请翻译成英文

作者&投稿:桐迫 (若有异议请与网页底部的电邮联系)
中文翻译成英文,急~

你好LL,很高兴为你解答:


I also wanted to close, but you have to go farther and farther。

如果你认可我的回答,请及时点击【采纳为满意回答】按钮~~手机提问者在客户端右上角评价点【满意】即可。~你的采纳是我前进的动力~~~如还有新的问题,请另外向我求助,答题不易,敬请谅解~~O(∩_∩)O,记得好评和采纳,互相帮助祝学习进步

你觉得每个人都享受他们的周末么?
上个月 他遛着狗散步
他坐下来看着他的狗跟一只友谊的黑猫玩耍
然后到了该回家的时间
。。???he has no dog and no family?? 他没狗也没家庭??

1. Production process with soft clay and drift as the main raw material beads. Material simple and easy to obtain.
2. Use of process equipment are all conventional equipment, easy to maintain.
3. Process layout of reasonably compact, smaller investment.
4. The production of products, excellent performance, high mechanical strength, low thermal conductivity. A wide range of applications.
5. The production processes of the waste can be broken into particles, re-used as raw materials.
Specific production process as follows:
1, ingredients
The project set up eight raw material silos (each effective volume: 6m3). Raw materials into the shop, by the LD-A3 electric single-girder crane raised to silo platform, dumping into the hopper. Silo bottom 2 sets 1000Kg measurement bucket, it can enter the material ratio, automatic weighing and good raw material, and the unloading of raw materials into the screw conveyor in the bottom of the TU219.
TU219 good screw conveyor then said screw conveyor of raw materials into the TU219.
2, mixed
Mixed with 2 sets of XLH-750 Planetary Mixer mandatory. Mixer is intermittent work, mixed approximately 15-20 minutes each time, even in the mixing process by adding an appropriate amount of water, to facilitate molding.
3, forming
Forming use 6 sets J53-100A friction press. The press easy to operate, suitable for production of lightweight brick.
Forming a good brick, after inspection, put drying cars, waiting to enter the drying kiln drying.
4, dry
Light clay brick dry slower, so I chose to select the 60m tunnel kilns. After a good drying brick seized after the election, into the tunnel kiln.
5, firing
The project kiln use 10,000 ton / year production line of high-temperature kiln brick tunnel kiln.
Good brick kiln drying plant for transport to the firing.
6, the prosecution elected, packaging
Cooked products, after careful inspection selection, packaging, you can sell or use. 3, forming
Forming use 6 sets J53-100A friction press. The press easy to operate, suitable for production of lightweight brick.
Forming a good brick, after inspection, put drying cars, waiting to enter the drying kiln drying.

这么长谁有空啊?参考Google翻译
1. Production process with soft clay and drift as the main raw material beads. Material simple and easy to obtain.
2. Use of process equipment are all conventional equipment, easy to maintain.
3. Process layout of reasonably compact, smaller investment.
4. The production of products, excellent performance, high mechanical strength, low thermal conductivity. A wide range of applications.
5. The production processes of the waste can be broken into particles, re-used as raw materials.
Specific production process as follows:
1, ingredients
The project set up eight raw material silos (each effective volume: 6m3). Raw materials into the plant, by the LD-A3 electric single-girder crane raised to silo platform, dumping into the hopper. Silo bottom 2 sets 1000Kg measurement bucket, it can enter the material ratio, automatic weighing and good raw material, and the unloading of raw materials into the screw conveyor in the bottom of the TU219.
TU219 good screw conveyor then said screw conveyor of raw materials into the TU219.
2, mixed
Mixed with 2 sets of XLH-750 Planetary Mixer mandatory. Mixer is intermittent work, mixed approximately 15-20 minutes each time, even in the mixing process by adding an appropriate amount of water, to facilitate molding.
3, forming
6 sets of molding used J53-100A friction press. The press easy to operate, suitable for production of lightweight brick.
Forming a good brick, after inspection, put drying cars, waiting to enter the drying kiln drying.
4, dry
Light clay brick dry slower, so I chose to select the 60m tunnel kilns. After drying a good review after the election brick, into the tunnel kiln.
5, firing
The project kiln use 10,000 ton / year production line of high-temperature kiln brick tunnel kiln.
Good brick kiln drying plant for transport to the firing.
6, the prosecution elected, packaging
Cooked products, after careful review selection, packaging, you can sell or use.

1. Production process with soft clay and drift as the main raw material beads. Material simple and easy to obtain.
2. Use of process equipment are all conventional equipment, easy to maintain.
3. Process layout of reasonably compact, smaller investment.
4. The production of products, excellent performance, high mechanical strength, low thermal conductivity. A wide range of applications.
5. The production processes of the waste can be broken into particles, re-used as raw materials.
Specific production process as follows:
1, ingredients
The project set up eight raw material silos (each effective volume: 6m3). Raw materials into the plant, by the LD-A3 electric single-girder crane raised to silo platform, dumping into the hopper. Silo bottom 2 sets 1000Kg measurement bucket, it can enter the material ratio, automatic weighing and good raw material, and the unloading of raw materials into the screw conveyor in the bottom of the TU219.
TU219 good screw conveyor then said screw conveyor of raw materials into the TU219.
2, mixed
Mixed with 2 sets of XLH-750 Planetary Mixer mandatory. Mixer is intermittent work, mixed approximately 15-20 minutes each time, even in the mixing process by adding an appropriate amount of water, to facilitate molding.
3, forming
6 sets of molding used J53-100A friction press. The press easy to operate, suitable for production of lightweight brick.
Forming a good brick, after inspection, put drying cars, waiting to enter the drying kiln drying.
4, dry
Light clay brick dry slower, so I chose to select the 60m tunnel kilns. After drying a good review after the election brick, into the tunnel kiln.
5, firing
The project kiln use 10,000 ton / year production line of high-temperature kiln brick tunnel kiln.
Good brick kiln drying plant for transport to the firing.
6, the prosecution elected, packaging
Cooked products, after careful review selection, packaging, you can sell or use.

请求英语怎么说?
答:问题七:“我希望你可以答应我的请求”用英语怎么说 I hope you can give me permission 问题八:请求支援 翻译成英语怎么说 请求支援 request support ; ask for support ; call for support ; call in help ; call for backup ; for reinforcement ; ask for assistance ...

请说中文翻译成英文怎么写
答:回答:speak Chinese,please.

“请查阅附件”中文翻译英文
答:请查阅附件的英文:Please refer to the attachment.一、refer 读法 英 [rɪ'fɜː] 美 [rɪ'fɝ]作不及物动词的意思: 参考;涉及;提到;查阅 作及物动词的意思:涉及;委托;归诸于;使…求助于 短语:refer to as 把…称作…refer a friend 介绍朋友;引见...

“请大家互相转告”翻译成英文怎么说
答:请大家互相转告 1) Please make sure everybody is informed/notified of the news.2)Everybody, please help pass on the news to anyone you know.

请排队, 不要插队(翻译成英文)谢谢
答:请排队 Please queue 不要插队 Please don't jump the queue 你既然离开了就要重新排队 You have to queue up again since you have left the queue before.

请帮我翻译成英文
答:Do you like Chinese delicious food?Let me introduce the English name of some Chinese traditional food.And you can guess the names matching with which kind of Chinese dishes.

请帮我翻译成英文
答:I hope that the integrity of the world and the good vulnerable groups can get their due rights and respect 重点词汇释义 希望hope; want; wish; expect 全世界all over the world; tout le monde 正直integrity; upright; honest; honesty; fair-minded 善良goodness; kindhearted; good and ...

翻译成英文:我已经把资料放在附件里,请查收
答:我已经把资料放在附件里,请查收的英文:I have put the information in the attachment. Please check it check 读法 英 [tʃek] 美 [tʃɛk]1、vt. 检查,核对;制止,抑制;在…上打勾;托运 2、vi. 核实,查核;中止;打勾;[象棋]将一军 3、n. <美>支票;制止,...

请帮我翻译成英文
答:I get off at the none-vehicle area, we view and appreciated world precious animals like white lions, white tigers, white kangaroos,pandas and Yangtse crocodile. In the beastie zoo, we saw there are a lot of small animals, they are rather cute.This trip to the zoo makes me ...

请把它拼写一下用英语怎么翻译?
答:请把它拼写一下用英语是 Please spell it.或 Spell it, please.祈使句是动词,原形开头。